NTHU Shuttle Bus Route Change Notification (11/1/2022-11/2/2022)
Due to the entry of hoisting equipment for the new construction site, the road surrounding the campus in the section between the Waste-Water Treatment Plant and the Tsing Hua Laboratory will be temporarily closed in both directions from Nov. 1 to Nov. 2, 2022. During this period of time, the driving routes of the shuttle buses will be changed as follows(Timetable):
Click Num: